Detroit Arsenal Garrison D/B Water Distribution System

Detroit Arsenal Garrison D/B Water Distribution System LOCATION: Warren, Michigan CLIENT: USACE Louisville and Detroit Districts PROJECT DESCRIPTION CTI, as Prime Contractor and in partnership with OHM, was responsible for the design, oversight, and general contracting performance of all phases of the Detroit Arsenal Garrison Base-Wide Water Distribution Replacement project. The objective of this project…

View project

Integrated Investigation & Remediation Strategy

Integrated Investigation & Remediation Strategy LOCATION: Lexington, Tennessee CLIENT: Confidential Client PROJECT DESCRIPTION As a prime contractor, CTI performed a wide range of environmental services including RI/FS, remedial design, and pilot/bench scale testing. At an active manufacturing facility in Lexington, TN, CTI worked closely with the client to develop a cost saving remediation strategy which…

View project

Fort Leonard Wood Streambank Stabilization

Fort Leonard Wood Streambank Stabilization LOCATION: Fort Leonard Wood Army Installation, Pulaski County, Missouri CLIENT: USACE Kansas City District PROJECT DESCRIPTION Through our Preplaced Remedial Action Contract (PRAC) with the USACE Kansas City District, CTI was awarded Task Order 0002 for emergency streambank repairs at the Fort Leonard Wood (FLW) Army Installation. This project included…

View project

In-Situ Remediation – NAS Hutchinson FUDS

In-Situ Remediation – NAS Hutchinson FUDS LOCATION: Yoder, Kansas CLIENT: USACE Kansas City District PROJECT DESCRIPTION CTI was contracted by USACE Kansas City District to reduce contaminant mass from groundwater via in-situ remediation at the Former Hutchinson Naval Air Station (Former HNAS) FUDS. Following remediation of the disposal trench and impacted soils in 2013 by…

View project

Test Track Engineering

Test Track Engineering LOCATION: Sterling Heights, Michigan CLIENT: BAE Systems PROJECT DESCRIPTION This project demonstrates CTI’s ability to provide geotechnical engineering services during both the design and construction phases of the BAE Systems Prototype Facility construction project. BAE Systems – Land & Armaments is a large vehicle manufacturer and supplier to the military including the…

View project

Interim RCRA Action – Debris Removal

Interim RCRA Action – Debris Removal LOCATION: Saline, Michigan CLIENT: Confidential PROJECT DESCRIPTION CTI was selected by a large automotive client to manage the Interim Removal Action required on the 9.3-acre site by a RCRA closure under the authority of the U.S. EPA and Michigan Department of Environmental Quality. The previous owner of the former…

View project